Meridian Precision Mfg. — Shift 2 Active

Your Pipeline,
Built for the
Shop Floor.

Pipeline stages that map to POs, ECNs, and 90-day tooling lead times — not generic CRM stages.

See Your Plant's Dashboard →
OPEN QUOTES BY STAGE
$6.13M Total
RFQ Intake
8 quotes$340K
BOM Validation
12 quotes$780K
Tooling Estimate
7 quotes$1.1M
Engineering Review
14 quotes$2.4M
Awaiting Approval
5 quotes$890K
PO Issued
9 quotes$620K
WIN RATE BY PRODUCT LINE
38.4%
Discrete
42%
Custom Tool.
31%
Process
38%
QUOTE-TO-CLOSE CYCLE TIMES (days)
ClosedActiveDelayed
0d
17d
34d
51d
68d
RFQ #4072
CNC Housing Assy.
38d
RFQ #4065
Precision Shaft ×200
22d
RFQ #4059
Die Cast Bracket
45d
RFQ #4051
Weld Fixture Kit
31d
RFQ #4044
Hydraulic Manifold
28d
Avg cycle: 32.8 days · Target: ≤30 days · Forge avg vs industry avg 68 days
RECENT ACTIVITY
Live

RFQ #4072 moved to Tooling Estimate

Sarah K.·12 min ago

RFQ #4069 approved — PO Issued

Marcus T.·41 min ago

ECN #882 flagged on RFQ #4065

System·1h ago

New RFQ #4078 — Hydraulic Manifold

Diana R.·2h ago

BOM validation completed — RFQ #4071

System·3h ago

RFQ #4063 — Tooling lead time updated: 94d

James W.·4h ago
KEY METRICS — Feb 25, 2026
Total Pipeline
$6.2M
+12% vs last qtr
Avg Quote Age
14.3d
-3d vs last qtr
Win Rate (YTD)
38.4%
+4.1% vs last qtr
Stalled Quotes
7
+2 vs last qtr
Quote-to-Close Automation/
BOM-Aware CPQ/
ECN Change Tracking/
Tooling Lead Time Sync/
Production Handoff/
Raw Material Volatility/
Revenue Forecasting/
Shop Floor Integration/
PO Lifecycle Management/
Engineering Review Workflows/
Quote-to-Close Automation/
BOM-Aware CPQ/
ECN Change Tracking/
Tooling Lead Time Sync/
Production Handoff/
Raw Material Volatility/
Revenue Forecasting/
Shop Floor Integration/
PO Lifecycle Management/
Engineering Review Workflows/

The numbers that keep your CFO up at night.

$0K

Average revenue lost per sales rep annually to misquoted BOMs, missed ECN revisions, and margin erosion on custom tooling estimates.

Source: 2024 Manufacturing Sales Benchmark Report · n=412 mid-market manufacturers
BOM mis-specification$156K
ECN not propagated to quote$119K
Tooling lead time underestimate$91K
Raw material price lag$46K
BOM error rate
14.2%0.3%
Quote rework time
8.4h0.4h
ECN propagation
ManualAuto
Margin accuracy
±18%±2.1%

Avg. across 94 Forge deployments in discrete manufacturing

When the BOM updates, the quote updates. Automatically.

Forge monitors every ECN, raw material index shift, and tooling lead time against open quotes. When a variance exceeds your margin threshold, the rep gets an alert before the customer sees a number.

$412K
Avg margin recovery
96%
Quote rework reduction
99.7%
ECN catch rate

68 days to close. Then they deployed Forge.

CNC machining facility with precision equipment on the shop floor
Apex Precision Components · Grand Rapids, MI
Discrete Manufacturing$34M Revenue
Before Forge
68d
avg quote-to-close
× 4 spreadsheets per quote
× Manual ECN checks
× Tooling estimates in email
After Forge
31d
avg quote-to-close
✓ Single source of truth
✓ Auto ECN propagation
✓ Tooling lead times in pipeline
CYCLE TIME COMPRESSION
Before
68 days
After
31 days
54% reduction · 2.2× more quotes per rep per quarter
+$2.1M
Revenue increase
+11pp
Win rate delta
2.2×
Quotes per rep/qtr
−94%
BOM rework events
“

We were losing deals in the handoff between quoting and production scheduling. Forge made that gap disappear. Our ops team now pulls up the same pipeline view the sales team uses — same data, same stage, no phone calls.

DK
David Kowalski
VP Sales · Apex Precision Components
Industry avg. quote-to-close
68 days
Forge customer avg.
31 days
Improvement
54%

Revenue forecasting that accounts for what actually changes.

BOM complexity, raw material indices, and tooling lead times are live inputs — not static assumptions.

BOM-Adjusted
+$2.8M
Committed
+$1.6M
High Prob
-$0.3M
BOM Risk
-$0.2M
Material Adj.
+$4.0M
Net Forecast
BOM Complexity Score
7.2/10
14 active multi-level BOMs
Material Volatility Index
Medium
Steel +8.4% · Carbide +19.7%
Forecast Confidence
88%
BOM-adjusted 30-day
Single-level34 quotes
Multi-level19 quotes
Phantom assembly9 quotes

Multi-level BOMs carry 3.2× more forecast variance without Forge.

Apex Tooling Co.
94dRisk
Midwest Die Works
62d
Great Lakes Tooling
78d
Precision Die Inc.
110dRisk

Forge flags quotes where tooling lead time exceeds deal close date.

⚙
BOM-Aware Quoting

Multi-level BOM complexity scores applied to every open quote. Margin risk flagged automatically.

📡
Live Material Index

Steel, aluminum, carbide, and polymer indices update quote margins without manual intervention.

🔔
ECN Propagation

Engineering change notices propagate to affected open quotes in under 60 seconds.

📊
VP-Ready Forecasts

Board-level revenue forecasts with BOM confidence intervals and material variance bands.

See what your plant's pipeline actually looks like.

We'll build a live Forge dashboard using your actual product types and revenue band. No generic demo — your plant's data structure.

Step 1 of 2

No credit card. No generic demo. Response within 1 business day.

Forge
Manufacturing
Sales
Benchmark
2024

2024 Manufacturing Sales Benchmark Report

412 mid-market manufacturers. Quote cycle times, win rates by product type, BOM error rates, and the $412K revenue gap. 38 pages.

340+
Manufacturers deployed
$2.4B
Pipeline managed
54%
Avg cycle reduction
99.7%
ECN catch rate

“Finally a CRM that knows what a routing sheet is.”

PO
Patricia Okafor
Sales Director · Lakeside Fabrication

“Our ops team and sales team are finally looking at the same number.”

CW
Chen Wei
VP Operations · Midwest Stampings